Indicate this Site | Add to Favourites | Your Home Page  
3/10/10 9:47 AM

Angola
Boavista/Refinary road with new drainage ditch


Luanda – The Luanda’s Boavista/Refinary road is being repaired and receiving a new drainage ditch, Angop learnt on Tuesday.

 


According to the head of company in charge of the works, Marcos Antunes, the first phase of the works consisted of location of electrical wires and water pipes, as well as destruction of infrastructures that were within the perimeter of the project.

 


After the construction works, the road will have two lanes, a drainage system, street lighting, road signs and others.

 


The repair of the road is part of the programme of the Angolan Government to rebuild Luanda’s structuring and tertiary roads.

 






 Print    Indicate
Latest News
10:08 AM - Chicala Cholohanga urbanistic plan unveiled
5:52 PM - Luanda to gain two new drinking water abstraction systems
4:50 PM - Construction minister works in Kwanza Norte
4:01 PM - Moxico hosts Urbanisation and construction consultative council
3:28 PM - Urbanisation minister tours four provinces
9:36 AM - Model for Porto Amboim City construction presented Tuesday
8:58 AM - New facility to supply 120.000 cubic metres of water per day
6:49 PM - Government announces 8,000 economic houses
4:39 PM - Inauguration of bridge over Munhino river
9:29 AM - Cazenga facelift programme implemented by 45 percent
TPA - Televisão Pública de Angola
RNA - Rádio Nacional de Angola
Jornal de Angola
© 1997 - 2008 Angop. All rights reserved.