Luanda – The inauguration of the public lighting on Luanda’s five-kilometre Shoprite/Sanatório/Golfe road will take place in April this year, when all the work in the area will be completed.
The information was supplied to Angop on Friday by the contractor company’s technician, João Filipe, who added that the foundations for the nine remainder pillars are being built, ahead of the installation of the power distribution cables.
The Shoprite/Sanatório/Golf road is being built since 2008. With three lanes on both directions, it connects with Gamek/Futungo/Benfica stretch, and facilitates communication between the Luanda districts of Viana, Kilamba Kiaxi and Samba.